DAWASA
Municipal

DAWASA

2024
Dar es Salaam, Tanzania
DAWASA

The Challenge

Large-scale municipal water treatment requiring reliable, cost-effective solutions for serving thousands of residents. Needed to improve water quality, reduce treatment costs, and ensure consistent supply while meeting stringent regulatory standards.

Our Solution

Implemented a comprehensive municipal water treatment facility with multi-stage filtration, advanced monitoring systems, and automated controls. Included capacity for future expansion and integrated maintenance protocols for long-term sustainability.

Technologies Implemented

Multi-Stage Filtration
Municipal Treatment
Automated Controls
Scalable Design

The Challenge: Serving a Growing Population

DAWASA (Dar es Salaam Water and Sewerage Authority) needed to expand water treatment capacity to serve a rapidly growing population. The existing facility was struggling to meet demand, and treatment costs were escalating. The authority needed a reliable, cost-effective solution that could scale with future growth.

Municipal Water Treatment Facility

Our Solution: Scalable Municipal Treatment

We designed and implemented a comprehensive municipal water treatment facility with multi-stage filtration, advanced monitoring systems, and automated controls. The system was designed with future expansion in mind, allowing capacity to be increased as the population grows.

Multi-Stage Filtration Automated Control System

Results: Reliable Service for Thousands

The new facility now serves over 50,000 residents with reliable, high-quality water. Treatment costs have been reduced by 35%, allowing the authority to serve more residents while maintaining quality standards. The automated systems ensure consistent operation with minimal operator intervention.

"Kilitek has been an exceptional partner in improving our municipal water services. The system reliability and cost savings have allowed us to serve more residents while maintaining the highest quality standards. Their expertise in large-scale projects is evident."

EFJ
Eng. Fatuma Juma
Director of Operations
DAWASA

Key Results

35%
Cost Reduction
50%
Efficiency Gain
99.6%
System Uptime

Project Metrics

Served Population
50,000+ residents
Daily Capacity
40,000 m³
ROI Achieved
20 months
Regulatory Compliance
100%

Project Details

Duration:12 months
Team Size:25 engineers
Capacity:40,000 m³/day

Ready to Achieve Similar Results?

Let's discuss how we can deliver similar results for your organization.

Request a Consultation
DAWASA Case Study - Municipal Water Treatment | Kilitek Africa